THE RESURRECTION- MARCH 2007

 

Okay, what has been done to date???? It's been a slow start as we've had many other things on the go.

#1- Cut out some useless brackets that were on since 2002....55 lbs lighter now....
 

#2- The two piece driveshaft has been ordered from Jesse at High Angle and should be on it's way...

#3- Raised the t- case 3-1/2 inches and twin sticked it....the rear driveshaft will be in the cut out of the cross member. Both front and rear driveshafts will be the same length

#4-shortened front links about 20 inches... All eight links are now equal lengths

    

A few pics of the knight stripped down

         

#5- The new Reid Racing inner c's arrived and will be going on

A little tube chopping

    

and a little fixing

         

 

The pace is going to be picked up now as we need the truck done and tested before our first outing which is not far away...More to come

 

Home Base