THE RESURRECTION- MARCH 2007
Okay, what has been done to date???? It's been a slow start as we've had many other things on the go.
#1- Cut out some useless
brackets that were on since 2002....55 lbs lighter now....
#2- The two piece driveshaft has been ordered from Jesse at High Angle and should be on it's way...
#3- Raised the t- case 3-1/2 inches and twin sticked it....the rear driveshaft will be in the cut out of the cross member. Both front and rear driveshafts will be the same length
#4-shortened front links about 20 inches... All eight links are now equal lengths
A few pics of the knight stripped down
#5- The new Reid Racing inner c's arrived and will be going on
A little tube chopping
and a little fixing
The pace is going to be picked up now as we need the truck done and tested before our first outing which is not far away...More to come